Construction continues apace. We are building profiles. Profiles are boards mounted to stakes that are mounted at specific heights that are found with a surveying tool. Then strings are mounted to the boards that follow critical lines through the structure -- center of pillars etc. Below is a picture with one of the profiles in the foreground and excavating equipment around.
The main building (the gin) has a basement over 5.5 meters deep. That's Jamaal down in the pit checking the depth.